How much coal does Pakistan import? The 2026 figures, and who is burning it

Pakistan imported about 7.0 million tonnes of coal in the first nine months of FY2025-26, up about 25% on a year earlier, according to PACRA. Port Qasim alone handled 10.95 million tonnes in the full year to June 2026. The sharper news for a local buyer is on the demand side: brick kilns burned nearly twice as much coal as the year before.

Smoke stacks of a power plant
Fig. 1Smoke stacks of a power plant. Stock photo

How much coal Pakistan imports, by source

No single national figure for the full year turned up, so here are the three we could trace. They count different things and should not be added together.

Coal figures for FY2025-26 and the latest year before it
MeasurePeriodFigureReported by
National coal importsJuly 2025 to March 2026About 7.0 million t, up about 25%PACRA, April 2026
Coal imports at Port QasimJuly 2025 to June 202610.95 million t, up 3.93 millionPort Qasim Authority, via The Express Tribune
Total coal consumed, local and importedJuly 2025 to March 202621.41 million t, up from 16.17 millionEconomic Survey 2025-26, from HDIP
Local productionFY2024-25About 11.7 million t, down about 15.8%PACRA
The Port Qasim total runs above what PACRA's nine-month pace would give for a year. The two come from different records, and the port figure is from one press report.

Who burned it: kilns nearly doubled

The Economic Survey splits consumption by sector. Power stayed the largest user at 59.6% of the nine-month total. Its tonnage rose about 13%. Brick kilns went from 2.29 to 4.45 million tonnes and their share from 14.2% to 20.8%. Cement and other industry went from 2.6 to 4.2 million tonnes.

The Survey gives no reason for the kiln jump. It does say that coal from fields other than Thar goes to brick kilns, which puts these tonnes squarely in the market for Duki, Chamalang and fines.

Coal burned by sector, July to March, thousand tonnes
  • Power FY2511,278.7 000 t
  • Power FY2612,758.3 000 t
  • Brick kilns FY252,292.3 000 t
  • Brick kilns FY264,451.9 000 t
  • Cement and others FY252,600 000 t
  • Cement and others FY264,200 000 t

Source: Pakistan Economic Survey 2025-26, Table 14.10, from the Hydrocarbon Development Institute of Pakistan.

A haul truck carrying coal through an open-pit mine
Fig. 2A haul truck carrying coal through an open-pit mine. Stock photo

Why imports jumped in 2026

Coal was the biggest single reason Port Qasim's imports grew. The port's total rose by 2.51 million tonnes to 38.09 million, so coal's 3.93 million rise more than covered the whole increase while other cargo fell.

BigMint, the commodity price service, says Pakistan's thermal coal imports more than doubled in the first quarter of 2026 because LNG supply was disrupted by the Middle East conflict.

Power stations felt the gap between the two coals. PACRA put the fuel cost of imported coal at about Rs 15.2 per kWh in March 2026 against about Rs 11.1 for local coal. The world price also swung hard that month: from US$106 a tonne on 27 February to US$129 on 5 March, back to US$101 by 17 April.

Where the imported coal comes from

PACRA puts South African imports at about 3.7 million tonnes in FY25, up about 24.9%, and Afghan imports at about 1.2 million tonnes. Bituminous coal made up about 89.2% of the total that year. The Afghan line has since broken: PACRA says the border closure cut cheaper coal to northern cement producers and pushed them to dearer imports.

Fauji Cement said at its 14 October 2026 briefing that its seaborne coal comes from South Africa and Mozambique.

Why cement plants matter to a kiln buyer

PACRA describes the cement sector as running mainly on imported coal. Two producers now report the opposite for themselves, and local coal is what a Punjab kiln buys too.

Fauji reported a mix of about 75% local and 25% imported coal, with local coal averaging about Rs 40,000 a tonne in FY26, and said it buys on the lowest heat cost per MMBtu. Pioneer Cement reported 95% local and 5% imported at about Rs 50,000 a tonne, according to CemNet's summary of AKD Securities.

It can swing back quickly. DG Khan Cement said in November 2025 that it had moved almost entirely to imported coal after the Afghan closure. A plant buying on heat cost changes supplier when the sum changes, so its demand for local coal can arrive or vanish within a season.

Compare your own quotes the same way. Duki run-of-mine at Rs 34,000 ex-Quetta and 5,500 kcal/kg works out at about Rs 6,182 per million kcal before freight, and our guide to imported coal shows how to set a landed price beside it.

Prices are indicative, per tonne, excluding sales tax, and change week to week. See today's sheet or ask us for a confirmed price.

GradesIn this guide

Grades mentioned

Lumps of black coal, close-up

Balochistan's most traded coal, lump or run-of-mine

Duki coal

Origin
Duki, Loralai, Balochistan
Heat value
5,500–6,500 kcal
Size
Lump or mixed
For
Brick kilns, small industry

FromRs 34,000per tonne, ex-yard

Dark, shiny pieces of coal, close-up

Higher-grade lump for kilns and cement blending

Chamalang coal

Origin
Chamalang, Loralai–Kohlu, Balochistan
Heat value
5,800–6,800 kcal
Size
Lump
For
Brick kilns, cement (blended)

FromRs 40,000per tonne, ex-yard

QuotationToday's price

Get a confirmed price.

Tell us what you need. We send you a written price within 2 working hours.

You sendCoal, tonnes, city
We replyWritten price in 2 h
We deliverKarachi and Punjab in 2–3 days
A loaded haul truck on a mine road
Coal
Tonnes

Written price within 2 working hours.

Private. Your number is only used to send your price.

Prefer WhatsApp? 0349 4384514

Delivery and guidesAll cities

Keep reading, or get coal delivered.