Pakistan's coal reserves are quoted at about 185 billion tonnes, and 99.7% of that is Thar lignite in Sindh. The coal that kilns and boilers in Punjab and Karachi burn comes from fields holding a few million tonnes each, so the headline number tells a buyer very little.

The province totals
PACRA's 2020 coal study, citing the State of Industry Report 2017, puts the total at 185,175 million tonnes: Sindh 184,623, Punjab 235, Balochistan 217, Khyber Pakhtunkhwa 91 and Azad Kashmir 9.
These are resources, not coal that can be dug tomorrow. Global Energy Monitor notes that only about 3.45 billion tonnes are measured, under 2% of the total. The rest is indicated, inferred or hypothetical.
Sindh: Thar and the fields near Hyderabad
Thar in Tharparkar district holds about 175,506 million tonnes on the Sindh Coal Authority figures in the PACRA study, and only 16% of it, 27,758 million tonnes, has been divided into the twelve numbered blocks. It is lignite at about 2,770 kcal/kg net and is burnt almost entirely for power. The article on Thar against Balochistan coal compares the two as fuels.
The same table lists Sonda and Jherruck at 5,523 million tonnes, Indus East 1,777, Lakhra 1,328, Meting and Jhimpir 473 and Badin 16. Lakhra and Sonda coal is wetter and higher in sulphur than Balochistan coal, about 28% moisture and 4.7% sulphur as received on USGS samples. The Sindh coal article covers what it costs to truck into Punjab.

Balochistan: small on paper, most of what industry burns
Balochistan's 217 million tonnes split as Khost, Sharig, Harnai and Ziarat 88, Duki 56, Sor Range and Degari 50 and Mach 23. Chamalang in Loralai and Kohlu is a working field too, but the published figures for it disagree too widely to quote. This coal gives about 5,800 to 6,500 kcal/kg, roughly twice Thar's heat, and it reaches Punjab and Karachi by truck in 2 to 3 days. Mining is mostly underground, by hand, in small leases, and the article on coal mine safety in Balochistan explains the risk that comes with that.
- Khost, Sharig, Harnai, Ziarat88 million tonnes
- Duki56 million tonnes
- Sor Range and Degari50 million tonnes
- Mach23 million tonnes
PACRA table; the four add to 217 with the rest of the province. Chamalang has no figure quoted.
Punjab, KP and Azad Kashmir
Punjab's 235 million tonnes are the Salt Range, 213, mined around Dandot and Choa Saidan Shah, and Makarwal in Mianwali, 22. Salt Range sulphur is reported anywhere from about 3% to over 10%, which limits it to brick kilns, cement and boilers near the mines. Khyber Pakhtunkhwa's 91 million tonnes are at Hangu, 82, and Cherat, 9. Azad Kashmir has about 9 near Kotli.
What limits supply
Not the ground. Small mines, safety stoppages, security and 2 to 3 days of trucking from Quetta to Punjab set the pace, which is why prices move week to week with huge reserves. For a buyer the useful question is which field suits the plant. A boiler with a sulphur limit wants Sor Range; a kiln that only needs heat can take Mach / Harnai or fines for less.