RDF fuel in cement plants in Pakistan is still a small part of the fire, and a coal seller should plan on it staying small for now. Pioneer Cement's management expects alternative fuels at around 7% of consumption across producers in FY27, according to CemNet's summary of AKD Securities. Refuse-derived fuel is shredded, sorted rubbish, and India's top cement grade starts at 4,500 kcal/kg against 6,000 for our Duki lump.

Silos and a conveyor at a cement plant
Fig. 1Silos and a conveyor at a cement plant. Stock photo

RDF fuel calorific value against coal

We found no published Pakistani RDF grades, so the nearest working standard is India's. Its October 2018 guidelines from the Ministry of Housing and Urban Affairs set three grades for cement plants, at above 3,000, 3,750 and 4,500 kcal/kg net, with moisture under 20%, 15% and 10% and chlorine under 1.0%, 0.7% and 0.5%.

A 2023 review in the Alexandria Engineering Journal gives car tyre rubber about 35.6 MJ/kg, which is about 8,500 kcal/kg and well above any coal we sell. So a plant replacing one tonne of Duki lump needs about two tonnes of the lowest grade RDF, and that is more handling, more feed and more water going into the kiln.

Heat per kilo: RDF grades, tyres and coal
  • Tyre rubber8,500 kcal/kg
  • Sor Range (our sheet)6,500 kcal/kg
  • Duki lump (our sheet)6,000 kcal/kg
  • RDF top grade, India4,500 kcal/kg
  • RDF middle grade, India3,750 kcal/kg
  • RDF lowest cement grade, India3,000 kcal/kg

RDF figures are the minimum net value for each grade. Sheet coal figures are our typical values, so the bases are not identical.

Who in Pakistan burns it

Most of the record is old and comes from the companies themselves. No plant-by-plant substitution rate for 2026 turned up in our search, so the dates below matter.

Alternative fuels at Pakistani cement plants, as reported
CompanyWhat is reportedDate of report
Lucky CementTyre-derived fuel from shredded tyres; RDF from municipal waste and rice huskSDPI paper, 2025
Fauji CementRDF plant of 12 tonnes an hour, described as Pakistan's firstSDPI paper, 2025
DG Khan CementBuying 1,000 tonnes of Lahore municipal waste to make RDFExpress Tribune, 2019
Bestway CementMunicipal and industrial waste and used tyresSDPI paper, 2025
Power CementRice husk and wheat straw at up to 5% of heat; about US$600,000 of fuel saved in six months; aims for 10 to 15%Global Cement, November 2023
Cherat CementProposal to use Peshawar's waste, about 500 tonnes a dayGlobal Cement, May 2025
An industrial plant with tall chimneys and white smoke
Fig. 2An industrial plant with tall chimneys and white smoke. Stock photo

What holds it back

The Pakistan Institute of Development Economics says a formal market for RDF and alternative fuel does not yet exist. An SDPI-led paper says the country has yet to carry out a full cost study and needs rules on waste sorting and fuel quality so that heat value stays steady. Both describe the same gap: a kiln needs the same fuel every day, and mixed municipal waste does not arrive that way.

What to check on an RDF offer

Anyone offering RDF to a plant should be able to show the same numbers a coal report shows, plus chlorine. The Indian guideline caps ash at 15% to 10% by grade, sulphur at 1.5% and asks for the figures as an average of each consignment. The 2023 review puts the working floor for co-processing at about 14 MJ/kg, roughly 3,350 kcal/kg, with moisture under 20%. Sulphur is the one place RDF beats our coal on paper: the cap is 1.5% against 4.5% on Duki lump and 3% on Sor Range.

What a 7% share would take from coal

The Economic Survey counts 4.2 million tonnes of coal for cement and other industry over nine months of FY26. Seven per cent of that is about 294,000 tonnes, or 11,760 trucks of 25 tonnes. That is a generous ceiling, because the line includes other industry. Brick kilns alone added about 2,159,600 tonnes over the same months.

So a coal trader should not expect RDF to move prices this winter. A plant's fuel buyer should treat the 7% as one broker's reading of one company's view: it rests on a single secondary report.

Questions people ask

Can a brick kiln burn RDF or tyres instead of coal?

Not in Punjab. The Smog Rules 2023 name tyres, plastic and rubber among banned fuels, and those are what RDF and tyre fuel are largely made of. A cement kiln runs far hotter and is a different case.

Prices are indicative, per tonne, excluding sales tax, and change week to week. See today's sheet or ask us for a confirmed price.

GradesIn this guide

Grades mentioned

Lumps of black coal, close-up

Balochistan's most traded coal, lump or run-of-mine

Duki coal

Origin
Duki, Loralai, Balochistan
Heat value
5,500–6,500 kcal
Size
Lump or mixed
For
Brick kilns, small industry

FromRs 34,000per tonne, ex-yard

A heap of coal pieces, close-up

The cleaner local coal, for boilers

Sor Range coal

Origin
Sor Range and Degari, Quetta
Heat value
6,000–7,000 kcal
Size
Lump or mixed
For
Textile and industrial boilers, brick kilns

FromRs 39,250per tonne, ex-yard

QuotationToday's price

Get a confirmed price.

Tell us what you need. We send you a written price within 2 working hours.

You sendCoal, tonnes, city
We replyWritten price in 2 h
We deliverKarachi and Punjab in 2–3 days
A loaded haul truck on a mine road
Coal
Tonnes

Written price within 2 working hours.

Private. Your number is only used to send your price.

Prefer WhatsApp? 0349 4384514

Delivery and guidesAll cities

Keep reading, or get coal delivered.