RDF fuel in cement plants: how much coal will it replace in Pakistan?
RDF fuel in cement plants in Pakistan is still a small part of the fire, and a coal seller should plan on it staying small for now. Pioneer Cement's management expects alternative fuels at around 7% of consumption across producers in FY27, according to CemNet's summary of AKD Securities. Refuse-derived fuel is shredded, sorted rubbish, and India's top cement grade starts at 4,500 kcal/kg against 6,000 for our Duki lump.

RDF fuel calorific value against coal
We found no published Pakistani RDF grades, so the nearest working standard is India's. Its October 2018 guidelines from the Ministry of Housing and Urban Affairs set three grades for cement plants, at above 3,000, 3,750 and 4,500 kcal/kg net, with moisture under 20%, 15% and 10% and chlorine under 1.0%, 0.7% and 0.5%.
A 2023 review in the Alexandria Engineering Journal gives car tyre rubber about 35.6 MJ/kg, which is about 8,500 kcal/kg and well above any coal we sell. So a plant replacing one tonne of Duki lump needs about two tonnes of the lowest grade RDF, and that is more handling, more feed and more water going into the kiln.
- Tyre rubber8,500 kcal/kg
- Sor Range (our sheet)6,500 kcal/kg
- Duki lump (our sheet)6,000 kcal/kg
- RDF top grade, India4,500 kcal/kg
- RDF middle grade, India3,750 kcal/kg
- RDF lowest cement grade, India3,000 kcal/kg
RDF figures are the minimum net value for each grade. Sheet coal figures are our typical values, so the bases are not identical.
Who in Pakistan burns it
Most of the record is old and comes from the companies themselves. No plant-by-plant substitution rate for 2026 turned up in our search, so the dates below matter.
| Company | What is reported | Date of report |
|---|---|---|
| Lucky Cement | Tyre-derived fuel from shredded tyres; RDF from municipal waste and rice husk | SDPI paper, 2025 |
| Fauji Cement | RDF plant of 12 tonnes an hour, described as Pakistan's first | SDPI paper, 2025 |
| DG Khan Cement | Buying 1,000 tonnes of Lahore municipal waste to make RDF | Express Tribune, 2019 |
| Bestway Cement | Municipal and industrial waste and used tyres | SDPI paper, 2025 |
| Power Cement | Rice husk and wheat straw at up to 5% of heat; about US$600,000 of fuel saved in six months; aims for 10 to 15% | Global Cement, November 2023 |
| Cherat Cement | Proposal to use Peshawar's waste, about 500 tonnes a day | Global Cement, May 2025 |

What holds it back
The Pakistan Institute of Development Economics says a formal market for RDF and alternative fuel does not yet exist. An SDPI-led paper says the country has yet to carry out a full cost study and needs rules on waste sorting and fuel quality so that heat value stays steady. Both describe the same gap: a kiln needs the same fuel every day, and mixed municipal waste does not arrive that way.
What to check on an RDF offer
Anyone offering RDF to a plant should be able to show the same numbers a coal report shows, plus chlorine. The Indian guideline caps ash at 15% to 10% by grade, sulphur at 1.5% and asks for the figures as an average of each consignment. The 2023 review puts the working floor for co-processing at about 14 MJ/kg, roughly 3,350 kcal/kg, with moisture under 20%. Sulphur is the one place RDF beats our coal on paper: the cap is 1.5% against 4.5% on Duki lump and 3% on Sor Range.
Questions people ask
Can a brick kiln burn RDF or tyres instead of coal?
Not in Punjab. The Smog Rules 2023 name tyres, plastic and rubber among banned fuels, and those are what RDF and tyre fuel are largely made of. A cement kiln runs far hotter and is a different case.
Prices are indicative, per tonne, excluding sales tax, and change week to week. See today's sheet or ask us for a confirmed price.