Captive power gas levy in 2026: what it now adds to steam, and when coal pays

The captive power gas levy is down to Rs 343 per MMBtu for August 2026, the latest month notified, from Rs 1,406 in January, after the formula was changed with the IMF. That cut a mill's captive gas bill by about a fifth, but gas steam still costs well over coal steam at this week's delivered coal prices. The sums below show where the break-even sits and what to check before you put in a coal boiler.

Rows of white thread spools on a mill rack
Fig. 1Rows of white thread spools on a mill rack. Stock photo

What the captive power gas levy is

The levy came in under the Off the Grid (Captive Power Plants) Levy Ordinance on 30 January 2025, as an IMF condition, and is charged on natural gas and RLNG supplied to plants that make their own electricity. It sits on top of the notified gas price and the money goes towards lowering grid power tariffs.

The Ordinance became the Off the Grid (Captive Power Plants) Levy Act 2025. Each month the Petroleum Division works out the gap between NEPRA's B3 industrial power tariff and what it costs a mill to generate on gas at the OGRA price, and notifies the levy that closes it. The Act steps the rate from 5% over the industrial tariff to 20% from August 2026.

The levy month by month

Up to March 2026 the formula used only the peak B3 tariff. In the IMF's third review talks in April it moved to an average of peak and off-peak rates, and the levy fell by more than half. The August figure was notified in October, so a mill's bill runs about two months behind the rate.

Captive power gas levy, Rs per MMBtu
MonthLevyGas at Rs 3,500 plus levy
December 20251,2434,743
January 20261,4064,906
February and March 20261,3034,803
April to June 2026 (about)5224,022
July 20265004,000
August 20263433,843
Rs 3,500 is the captive power gas price notified from 1 July 2025. No rate for September or later had been reported when we checked on 13 November 2026.
Red valve wheels on steam pipes in a boiler room
Fig. 2Red valve wheels on steam pipes in a boiler room. Stock photo

APTMA's complaint about the RLNG blend

In a letter to the Petroleum Secretary reported on 11 June 2026, APTMA said the formula assumes gas at Rs 3,500 per MMBtu while captive plants on SNGPL get 75% RLNG at Rs 4,732.76 and 25% system gas at Rs 3,500. That blend works out at Rs 4,424.57. On that real fuel cost, it said, the March levy would have been minus Rs 603, and correcting its other objections on fixed charges and maintenance would take it to about minus Rs 810.

APTMA's point is that captive power is already dearer than the grid. For the steam sums below, it means a Punjab mill on blended gas pays nearer Rs 4,768 with the August levy than Rs 3,843.

Steam cost per tonne: captive gas against coal

One tonne of steam needs about 2,530 MJ, or 0.604 million kcal, as worked in our guide to gas to coal boiler conversion. Gas cost = Rs per MMBtu / (0.252 × 0.85) × 0.604. Coal cost = delivered Rs a tonne / (kcal per kg / 1,000) / 0.75 × 0.604. The efficiencies are mid-range figures from our steam cost guide comparing gas, coal and furnace oil; your boiler's tested figure beats them.

Sor Range delivered to Lahore is Rs 52,250 a tonne at 6,500 kcal/kg, giving Rs 6,477 a tonne of steam. Gas at Rs 3,843 gives Rs 10,841. Across 1,000 tonnes of steam that gap is about Rs 4.4 million, before ash handling, labour and the dust collector.

Fuel cost of one tonne of steam, Rs
  • Gas, January levy (Rs 4,906)13,840 Rs/t steam
  • Gas, RLNG blend plus August levy (Rs 4,768)13,450 Rs/t steam
  • Gas, August levy (Rs 3,843)10,841 Rs/t steam
  • Gas with no levy (Rs 3,500)9,874 Rs/t steam
  • Chamalang lump, delivered6,778 Rs/t steam
  • Duki lump, delivered6,949 Rs/t steam
  • Sor Range, delivered6,477 Rs/t steam

Gas at 85% boiler efficiency, coal at 75%, coal at this week's delivered price before sales tax. Leaves out ash, labour, power for fans and the cost of the boiler.

When a coal boiler pays

Turn the sum round and you get the gas price at which coal stops saving money on fuel. For Sor Range it is about Rs 2,296 per MMBtu, and for Duki lump about Rs 2,463. Gas with no levy at all is above both, so the levy cut narrowed the gap but did not close it.

What decides it is the boiler. A mill that makes its steam from the exhaust of its own gas engines gets that heat with its power, and moving power to the grid means buying a boiler as well. Price a coal boiler with its fuel store, ash removal and dust collector, divide by the saving per tonne of steam above, and you have the tonnes of steam needed to pay it back.

The Pakistan Textile Council asked in March 2026 for efficient cogeneration units to be certified and reclassified as industrial gas connections, outside the levy. If that ever happens, a cogeneration mill's sum changes again, so check it before you order steel.

  • Sulphur against your permit: the one truck Lab Zrk tested on 30 October 2026 read 1.89% on a dry basis; the sheet gives Sor Range at 3% and Duki lump at 4.5%.
  • Size for your grate, so fines do not blow through and big lumps do not burn unevenly.
  • Stock for a gas cut or a road strike: one 25-tonne truck of Sor Range is Rs 1,306,250 delivered before tax.
  • Ash: someone has to take it away every day.

Questions people ask

Where does the coal price in these sums come from?

From the delivered column on our price sheet this week, which includes road freight of about Rs 13,000 a tonne from Quetta to Lahore. Prices are confirmed when you contact us.

Prices are indicative, per tonne, excluding sales tax, and change week to week. See today's sheet or ask us for a confirmed price.

GradesIn this guide

Grades mentioned

A heap of coal pieces, close-up

The cleaner local coal, for boilers

Sor Range coal

Origin
Sor Range and Degari, Quetta
Heat value
6,000–7,000 kcal
Size
Lump or mixed
For
Textile and industrial boilers, brick kilns

FromRs 39,250per tonne, ex-yard

Lumps of black coal, close-up

Balochistan's most traded coal, lump or run-of-mine

Duki coal

Origin
Duki, Loralai, Balochistan
Heat value
5,500–6,500 kcal
Size
Lump or mixed
For
Brick kilns, small industry

FromRs 34,000per tonne, ex-yard

Dark, shiny pieces of coal, close-up

Higher-grade lump for kilns and cement blending

Chamalang coal

Origin
Chamalang, Loralai–Kohlu, Balochistan
Heat value
5,800–6,800 kcal
Size
Lump
For
Brick kilns, cement (blended)

FromRs 40,000per tonne, ex-yard

QuotationToday's price

Get a confirmed price.

Tell us what you need. We send you a written price within 2 working hours.

You sendCoal, tonnes, city
We replyWritten price in 2 h
We deliverKarachi and Punjab in 2–3 days
A loaded haul truck on a mine road
Coal
Tonnes