Coal testing lab in Pakistan: where to send a sample and what to order

A coal testing lab in Pakistan means PCSIR in Lahore or Karachi, or an inspection company's lab in Korangi, Karachi. Bureau Veritas runs the one coal lab we could confirm on the national accreditation list, with calorific value, ash, moisture, volatile matter and sulphur in its scope. None of these labs publishes a coal fee that we could find, so below is what a result is worth on a truck and what to ask before you send a bag.

A laboratory bench with test instruments
Fig. 1A laboratory bench with test instruments. Stock photo

Coal testing labs in Pakistan and what each one lists

The Pakistan National Accreditation Council (PNAC) holds the scope document for each lab it accredits to ISO/IEC 17025. Its paper LAB 299 for the Bureau Veritas coal lab was first granted on 23 November 2023 and runs to 22 November 2026, so a reader after that date should ask to see the renewal.

PCSIR, the government's industrial research council, publishes long test lists for its Lahore and Karachi complexes. Those lists date from about 2020 and carry no coal fees, so treat them as a sign of what to ask about.

Where coal tests are listed in Pakistan
LabCityWhat its paper lists for coal
Bureau Veritas Pakistan, coal testing laboratoryPlot 21, Sector 30, Korangi Industrial Area, KarachiPNAC accredited for coal, coke and pet coke: total and inherent moisture, volatile matter, ash, gross and net calorific value, sulphur
PCSIR Laboratories ComplexLahoreMoisture, ash, volatile matter, fixed carbon and total sulphur in coal or coke by ASTM methods; calorific value under solid waste and fuel analysis
PCSIR Laboratories ComplexKarachiProximate analysis, total and inherent moisture, ash, volatile matter, fixed carbon, calorific value and the elements of an ultimate analysis
SGS PakistanKorangi Industrial Area, KarachiIts petroleum coke page lists moisture, proximate and ultimate analysis, gross and net calorific value and HGI; ask whether coal goes through the same lab
Control UnionKarachiAn undated vacancy for a chemist to commission a coal lab; ask whether it is open
Only Bureau Veritas is shown here with a PNAC coal scope because that is the paper we read. Others may hold accreditation we did not see.

Which tests to write on the form

A kiln owner paying by the tonne wants heat, ash and water. A boiler or foundry adds sulphur. The methods below are the ones on the Bureau Veritas scope, and writing the method number on your request stops a lab quietly running something else.

The list does not show ash fusion temperature, the test for clinker risk, so ask for that one by name if your grate is fusing. Ask for results as received as well as air dried, because a figure on ADB will read higher than the coal you unloaded.

Coal tests and the methods on an accredited scope
TestASTM methodISO methodWho needs it
Total moistureD3302ISO 589Everyone paying by weight
AshD3174ISO 1171Kilns, boilers, anyone carting ash away
Volatile matterD3175ISO 562Kilns and small boilers judging how the coal lights
Gross and net calorific valueD5865ISO 1928Everyone; this is the figure the price rests on
SulphurD4239ISO 19579Boilers, foundries, lime
A hand holding a piece of coal
Fig. 2A hand holding a piece of coal. Stock photo

Taking a sample the supplier will accept

ASTM D6883 is the standard for hand sampling coal that is standing in a truck, railcar, barge or stockpile. ASTM says the sample must come from beneath the surface, and that the method does not reach the precision of its main sampling practice, D2234. It also says its use depends on all parties agreeing the details before sampling begins.

That last line is the useful one for a buyer. Settle before the truck is tipped who takes the sample, from how many points and who keeps the second bag. A report from a bag only one side filled is hard to take back to a supplier, however good the lab. The steps for bagging and sealing at the weighbridge are in our delivery guide.

What a heat shortfall costs on one truck

A test pays for itself when the gap it can prove is bigger than the fee and the courier. Duki lump is Rs 51,750 a tonne delivered on this week's sheet at 6,000 kcal/kg. Every 100 kcal/kg missing is therefore worth about Rs 863 a tonne, or Rs 21,563 on a 25-tonne truck.

Set any fee quote against those figures. On a small gap, one truck may not justify a lab. On a regular supply, testing one truck in a run spreads the cost across all of them.

Heat missing from one 25-tonne truck of Duki lump, valued at the delivered sheet price
  • 100 kcal/kg short21,563 Rs
  • 200 kcal/kg short43,125 Rs
  • 300 kcal/kg short64,688 Rs
  • 500 kcal/kg short107,813 Rs

Straight sum on heat alone, before sales tax. It leaves out extra ash and water.

What to ask the lab before you send a bag

Since no coal fee is published, put these to the lab in writing and compare two replies. If a report disagrees with a truck we supplied, WhatsApp us the report with the truck number.

  • The rate per sample for each test, and for the full set.
  • Working days from receipt to report.
  • Whether each test sits inside the accredited scope, and whether the report will say so.
  • How much coal it wants, and at what top size.
  • Which bases the report will show: as received, air dried, dry.
  • Whether a couriered bag from Quetta or Punjab is accepted, or a person must hand it in.

Prices are indicative, per tonne, excluding sales tax, and change week to week. See today's sheet or ask us for a confirmed price.

GradesIn this guide

Grades mentioned

Lumps of black coal, close-up

Balochistan's most traded coal, lump or run-of-mine

Duki coal

Origin
Duki, Loralai, Balochistan
Heat value
5,500–6,500 kcal
Size
Lump or mixed
For
Brick kilns, small industry

FromRs 34,000per tonne, ex-yard

QuotationToday's price

Get a confirmed price.

Tell us what you need. We send you a written price within 2 working hours.

You sendCoal, tonnes, city
We replyWritten price in 2 h
We deliverKarachi and Punjab in 2–3 days
A loaded haul truck on a mine road
Coal
Tonnes

Written price within 2 working hours.

Private. Your number is only used to send your price.

Prefer WhatsApp? 0349 4384514

Delivery and guidesAll cities

Keep reading, or get coal delivered.