Gas load shedding this winter: how much backup coal a factory needs

Gas load shedding in winter 2026 to 27 has no announced schedule yet, and a factory cannot wait for one. As of 28 October SNGPL has published nothing, so the useful number is how much coal your boiler would burn on the day the gas drops.

Red valve wheels on steam pipes in a boiler room
Fig. 1Red valve wheels on steam pipes in a boiler room. Stock photo

What last winter's plan looked like

For December 2025 to February 2026 SNGPL gave homes in Punjab and KP gas in three daily windows: 5:30 to 8:30 am, 11:30 am to 1:30 pm and 5:30 to 8:30 pm, eight hours of twenty-four. Officials said industry would not be cut. In earlier winters non-export industry was cut to keep homes supplied, so one year's statement is not a promise for the next.

Anyone sharing a new schedule on WhatsApp now is passing on last year's timings. A household that needs heat outside the windows should read the article on coal heater safety before lighting anything in a shut room.

Gas has already got dearer for factories

Under the IMF programme the gas price for captive power was raised and a grid levy added from March 2025, scheduled to climb in steps to about Rs 6,000 per mmBtu by August 2026. Even with full supply, many units now find coal cheaper for steam and heat. Check the grate, the feed system and the chimney before the first cut, because a boiler that has stood idle on gas needs a walk-round before it is asked to run for days.

An industrial loom weaving white cloth in a textile mill
Fig. 2An industrial loom weaving white cloth in a textile mill. Stock photo

How much coal replaces your gas

Take the gas you burn on a normal winter day, turn it into heat, and divide by the heat in the coal. One mmBtu is about 252,000 kcal; Duki lump gives about 6,000 kcal/kg. The chart assumes 85% efficiency on gas and 75% on coal, so substitute your own figures if you have them.

Keep enough for the gap between ordering and delivery plus a few days. A truck from Quetta takes 2 to 3 days on the road to Punjab, and loading can add one. Two weeks is a sensible floor for a plant that cannot stop. Our minimum order is 25 tonnes, so the smaller rows are one truck at a time.

Duki lump needed a day to replace gas
  • 25 mmBtu of gas a day1.2 tonnes a day
  • 50 mmBtu of gas a day2.4 tonnes a day
  • 100 mmBtu of gas a day4.8 tonnes a day
  • 200 mmBtu of gas a day9.5 tonnes a day

Tonnes a day = mmBtu x 252,000 kcal x (0.85 / 0.75) divided by 6,000,000 kcal per tonne. Fourteen days of stock is the daily figure times 14.

Ash, order timing and price

A tonne of coal at 15% ash leaves about 150 kg, so a boiler on five tonnes a day makes three quarters of a tonne of ash every day that someone has to rake, wet and cart away. The article on coal ash covers where it can go.

Delivered to Punjab, Duki lump is Rs 51,750 a tonne, Sor Range Rs 52,250 and fines Rs 38,000, confirmed when you contact us. Order in November. When many plants switch in the same week, trucks get scarce and loading queues grow.

Questions people ask

Will industry get gas this winter?

Nothing has been announced. Last winter officials said industry would not be cut, but non-export industry was cut in earlier winters to protect home supply. Plan a backup fuel to be safe.

Can a gas boiler burn coal without changes?

No. A gas burner cannot take coal; the grate, feeder and ash handling have to be fitted. Our article on switching a boiler from gas to coal covers the work.

Prices are indicative, per tonne, excluding sales tax, and change week to week. See today's sheet or ask us for a confirmed price.

GradesIn this guide

Grades mentioned

Lumps of black coal, close-up

Balochistan's most traded coal, lump or run-of-mine

Duki coal

Origin
Duki, Loralai, Balochistan
Heat value
5,500–6,500 kcal
Size
Lump or mixed
For
Brick kilns, small industry

FromRs 34,000per tonne, ex-yard

A heap of coal pieces, close-up

The cleaner local coal, for boilers

Sor Range coal

Origin
Sor Range and Degari, Quetta
Heat value
6,000–7,000 kcal
Size
Lump or mixed
For
Textile and industrial boilers, brick kilns

FromRs 39,250per tonne, ex-yard

A matte block of coal on a white background

The cheapest heat, for firing and blending

Coal fines (choora)

Origin
Duki, Mach and Harnai fields
Heat value
4,500–5,500 kcal
Size
0–10 mm
For
Brick kiln firing, blending

FromRs 25,000per tonne, ex-yard

QuotationToday's price

Get a confirmed price.

Tell us what you need. We send you a written price within 2 working hours.

You sendCoal, tonnes, city
We replyWritten price in 2 h
We deliverKarachi and Punjab in 2–3 days
A loaded haul truck on a mine road
Coal
Tonnes

Written price within 2 working hours.

Private. Your number is only used to send your price.

Prefer WhatsApp? 0349 4384514

Delivery and guidesAll cities

Keep reading, or get coal delivered.