Articles / 4 min read
How to start a coal business in Pakistan: depot or trading, step by step
To start a coal business in Pakistan you need a source, a registration and enough cash to pay for a truck before anyone pays you. A truck is 25 tonnes at the least, so the order below puts money first and the yard last.

Step 1. Decide between trading and a depot
A trader buys at the mine or from a Quetta depot and sends the coal straight to the buyer, never unloading it. A depot keeps stock in a yard near the buyers, in Faisalabad, Gujranwala, Multan or on the edge of a kiln cluster, and sells by the truck or by the tonne.
Trading needs no land and less cash in stock, but you live on the phone and every load is a fresh negotiation. A depot needs land, a loader and a weighbridge, and buyers come to you. Many start as traders and open a yard once they have steady buyers.
Step 2. Put a number on one truck
Work out how many trucks you can fund at once and how long each takes to turn back into cash. A trader pays at loading and waits for the buyer. A depot owner pays, then waits for the stock to sell, and buyers who pay after 30 days leave your money out for a month or more on every load.
- Coal fines6.3 Rs lakh
- Mach / Harnai8.1 Rs lakh
- Duki run-of-mine8.5 Rs lakh
- Duki lump9.7 Rs lakh
- Sor Range9.8 Rs lakh
- Chamalang lump10 Rs lakh
Price per tonne on the sheet times 25, divided by 100,000. Freight, tax and loading come on top.

Step 3. Find sources and learn the fields
Most coal for Punjab's kilns and boilers comes from Balochistan: Duki, Chamalang, Sor Range, Mach and Harnai, loaded through Quetta. Sindh coal from the mines near Hyderabad is the other option. Visit the loading points, see how the coal is sized and stored, and buy from people who will be there next season.
Ash, sulphur and moisture differ between fields as much as heat does, and buyers notice. The article on how to check coal quality on delivery describes what your own buyers will do to your truck. Every truck should carry its movement papers.
| Grade | Heat (kcal/kg) | Ash % | Sulphur % | Moisture % | Ex-Quetta, Rs a tonne |
|---|---|---|---|---|---|
| Duki lump | 6,000 | 15 | 4.5 | 7 | 38,750 |
| Duki run-of-mine | 5,500 | 20 | 5 | 8 | 34,000 |
| Chamalang lump | 6,300 | 11 | 4.5 | 6 | 40,000 |
| Sor Range | 6,500 | 9 | 3 | 6 | 39,250 |
| Mach / Harnai | 5,800 | 20 | 6 | 7 | 32,500 |
| Coal fines | 5,000 | 25 | 5 | 9 | 25,000 |
Step 4. Register for tax
Start with an NTN. For an individual the 13-digit CNIC number works as the NTN once registered on FBR's IRIS portal; a company or partnership gets its own. Factory buyers want a sales tax invoice so they can claim input tax, and registration for sales tax is done on IRIS through Form 14(1), with bank details, GPS-tagged photos of the premises and utility meter details. FBR then requires biometric verification at a NADRA e-Sahulat centre within 30 days, or the business drops off the Active Taxpayer List.
Profit reported that from January 2025 new non-manufacturer applicants also have to submit a balance sheet showing business capital. Mining, royalty and coal movement rules come from Balochistan's Mines and Minerals Development Department, and a new Balochistan Mines and Minerals Act was passed in March 2025. Ask the department or a tax practitioner in Quetta what applies to your set-up before the first truck. The sales tax calculator on this site shows how the invoice adds up.
- CNIC and a registered NTN on IRIS.
- A business bank account in the same name.
- Premises: rent agreement or ownership paper, a utility bill, GPS-tagged photos.
- Form 14(1) for sales tax, then NADRA biometric verification within 30 days.
- A balance sheet showing capital, if you register as a non-manufacturer.
Step 5. Build the yard if you want a depot
Firm, drained ground that trucks can turn on, and a separate heap for each field and size. Mixing Duki lump with Harnai fines because there was no space is how depots lose customers. Keep stock off low ground and covered, because wet coal weighs more and burns worse and buyers know it.
A loader can be hired by the hour. The weighbridge is the heart of trust in this trade: if you cannot afford your own, use a public one and hand the buyer the slip with every truck. Axle limits apply to your trucks too, and the article on truck overloading fines covers the current enforcement.
Step 6. Give credit slowly
The trade runs on credit. Mines and Quetta depots want payment at loading, while kilns and factories in Punjab often want 30 days or more, and you sit in the middle. Brick kilns are seasonal and exposed to the smog rules: a kiln sealed by the EPA in November cannot pay in December. A cheque that bounces after three trucks is a loss you carry for months.
Questions people ask
Where do coal traders in Pakistan buy coal?
Mostly from mines and depots in Balochistan (Duki, Chamalang, Sor Range, Mach and Harnai, loaded through Quetta) and from Sindh mines near Hyderabad, then trucked to Punjab and Karachi.
Can I start with less than a full truck of cash?
Not from us: the minimum order is 25 tonnes. Two or three traders can split one truck and share the freight.
Prices are indicative, per tonne, excluding sales tax, and change week to week. See today's sheet or ask us for a confirmed price.



