Coal merchants, QuettaDelivering to Punjab and Karachi

اردو
0349 4384514Get a quote

Articles / 5 min read

Thar coal price for industry in 2026: Sindh's new framework and your gate cost

The Thar coal price that power plants pay was Rs 14,374 a tonne at the mine for April to June 2026, but Sindh has not yet published the price it will charge factories and kilns. The Thar Coal and Energy Board approved a separate pricing chapter for non-power buyers on 5 November 2026, with short-term and long-term terms, and the figures are still to come. Until they do, the power tariff is the best yardstick, and on heat delivered to a Punjab gate it does not beat Balochistan coal once freight is added.

Excavators and dump trucks working a coal mine
Fig. 1Excavators and dump trucks working a coal mine. Stock photo

What Sindh approved in November

Chief Minister Murad Ali Shah chaired the 31st meeting of the Thar Coal and Energy Board, which replaced Chapter 3 of the Thar Coal Pricing Framework 2015 with a new chapter titled Thar Coal Price for Non-IPPs. It sets separate terms for short-term and long-term supply. The cost of selling to these buyers must not pass into the tariffs of the power plants, and capacity charges that electricity consumers have already paid must be credited back to them.

The reports give no rupee or dollar figure and no start date. So nobody outside the board and the mining companies can yet quote you a Thar price for a boiler or kiln. Treat any number offered before the chapter is published as a sales figure, and ask which clause of the framework it rests on.

The Thar coal price power plants pay now

Sindh Engro Coal Mining Company files a tariff with the board every quarter. Its filing for April to June 2026, dated 3 September, puts the price at Rs 14,374 a tonne, up from a reference of Rs 12,762. Of that, Rs 8,128 is fixed capacity payments, the cost of the mine whether it digs or not, and Rs 6,246 is the variable cost of digging each tonne. Fuel is the item that rose most, from Rs 1,793 to Rs 2,814 a tonne.

That split matters for a factory buyer. The new chapter says power consumers must not pay twice for the mine, so a non-power buyer is unlikely to be offered only the variable cost. Where between the two figures the industrial price lands is exactly what the published chapter will settle.

SECMC Thar coal tariff to power plants, April to June 2026
  • Fixed capacity payments8,128 Rs/t
  • Variable production payments6,246 Rs/t
  • Total at the mine14,374 Rs/t

From SECMC's indexation filing to the Thar Coal and Energy Board. Before sales tax and before any freight.

A decorated goods truck on a two-lane highway
Fig. 2A decorated goods truck on a two-lane highway. Stock photo

Thar coal price per million kcal at a Punjab gate

The same filing gives a heating value of 11.48 for the quarter. NEPRA's July 2026 papers put coal burned at a Thar plant in the same months at 10,710 Btu per kg, which is 11.3 MJ, so the figure is in MJ per kg. 11.48 MJ is about 2,742 kcal/kg. At the mine that is Rs 14,374 / 2.74 = about Rs 5,242 per million kcal.

Duki lump on this week's sheet is Rs 51,750 a tonne delivered to Lahore, which is Rs 38,750 ex-Quetta plus about Rs 13,000 a tonne road freight. At 6,000 kcal/kg that is Rs 8,625 per million kcal. For Thar lignite to match it, freight from the mine to your gate must stay under Rs 9,275 a tonne: 8,625 × 2.74 − 14,374.

We have no Thar freight quote for Punjab. If trucking cost the same Rs 13,000 a tonne we pay from Quetta to Lahore, Thar coal would land at Rs 27,374 a tonne and Rs 9,983 per million kcal, about 16% dearer than Duki lump for the same heat. You pay to haul the water in it, which is why the gap grows with every kilometre.

Cost of heat at a Lahore gate, Rs per million kcal
FuelRs a tonnekcal/kgRs per million kcal
Thar lignite at the mine, power tariff14,3742,7425,242
Thar lignite with Rs 13,000 freight27,3742,7429,983
Duki lump, delivered51,7506,0008,625
Duki run-of-mine, delivered47,0005,5008,545
Sor Range, delivered52,2506,5008,038
Chamalang lump, delivered53,0006,3008,413
Thar heat is the as-received value from SECMC's filing; our figures are the typical values on the price sheet. Before sales tax. The industrial Thar price is not yet published and may differ from the power tariff.

Moisture: the part the price does not show

Thar coal comes out of the ground at about 45% moisture. The board's meeting also marked a drying and briquetting unit in Block I, built to bring that down to 18%. It takes in 30 tonnes an hour and turns out 22, so it is a pilot beside an 11.2 million tonne mine, not a supply you can book trucks from.

For comparison, one truck of our local coal tested by Lab Zrk on 30 October 2026 (report C578, size 0/50) showed 14.10% moisture, with 6,333 kcal/kg on a dry basis. That is a single truck, and the full report is on our supply page. A wet fuel also burns differently: a kiln or grate built for hard coal needs more feed, more air and a slower fire before lignite gives its heat.

How to buy Thar coal, and who it suits

The mining companies sell under the board's tariff, not through depots, so the route for a factory is a supply agreement with the mine on the new short-term or long-term terms. Rail will change the haul in time. The Rs 90.3 billion line from the mines to New Chhor was 68% built at the November meeting, and the Block II loading station 55%, with March 2027 set for finishing it.

Cement makers have tried it before. Dawn reported in January 2023 that Power Cement would burn Thar coal on a trial basis, after an earlier Bestway trial, and that SECMC had not then set a price for cement.

Thar suits a large plant in Sindh or near Karachi that can sign a long contract, store wet coal and burn it in a boiler or kiln built for it. A Punjab mill or kiln buying a few trucks a month is better served by Balochistan coal at a known grade, and our earlier guides cover the comparison of the two coals and whether factories can buy Thar output at all. When the chapter is published, put its price into the table above with your own freight quote before you decide.

  • The price per tonne and whether it is the short-term or long-term rate
  • Heat value and moisture as received, with the basis written on the paper
  • Whether the price is at the mine, at a rail siding or at your gate
  • Minimum quantity and how long the contract binds you
  • Who pays for coal lost to drying and crumbling on the way

Questions people ask

Is the power plant Thar price the same in every quarter?

No. SECMC files an indexation each quarter for the exchange rate, interest rates, inflation and diesel, so the figure moves four times a year.

Prices are indicative, per tonne, excluding sales tax, and change week to week. See today's sheet or ask us for a confirmed price.

GradesIn this guide

Grades mentioned

Lumps of black coal, close-up

Balochistan's most traded coal, lump or run-of-mine

Duki coal

Origin
Duki, Loralai, Balochistan
Heat value
5,500–6,500 kcal
Size
Lump or mixed
For
Brick kilns, small industry

FromRs 34,000per tonne, ex-yard

A heap of coal pieces, close-up

The cleaner local coal, for boilers

Sor Range coal

Origin
Sor Range and Degari, Quetta
Heat value
6,000–7,000 kcal
Size
Lump or mixed
For
Textile and industrial boilers, brick kilns

FromRs 39,250per tonne, ex-yard

Dark, shiny pieces of coal, close-up

Higher-grade lump for kilns and cement blending

Chamalang coal

Origin
Chamalang, Loralai–Kohlu, Balochistan
Heat value
5,800–6,800 kcal
Size
Lump
For
Brick kilns, cement (blended)

FromRs 40,000per tonne, ex-yard

QuotationToday's price

Get a confirmed price.

Tell us what you need. We send you a written price within 2 working hours.

You sendCoal, tonnes, city
We replyWritten price in 2 h
We deliverKarachi and Punjab in 2–3 days
A loaded haul truck on a mine road
Coal
Tonnes

Written price within 2 working hours.

Private. Your number is only used to send your price.

Prefer WhatsApp? 0349 4384514

Delivery and guidesAll cities

Keep reading, or get coal delivered.