How much coal stock to hold before December gas cuts and fog

A factory on coal in December can be stopped by two things on the calendar: gas cuts that send everyone to coal at once, and fog that holds trucks on the motorway. Stock to hold is the daily burn times the days between order and delivery plus a fog buffer, rounded up to whole trucks.

Traffic on a highway in dense fog
Fig. 1Traffic on a highway in dense fog. Stock photo

The two risks

ProPakistani reported on 22 October 2026 that gas shortages are a risk from November to February, with December and January the peak. A proposal to import 22 LNG cargoes at about USD 2 billion had not been approved by the Cabinet Committee on Energy, Qatar's force majeure was reported to run until November, and winter demand was projected to rise from 850 million to 1,600 million cubic feet a day. Households have priority; power, industry and fertiliser are supplied as availability allows, and cement and other industry could be cut in a severe shortage.

Aaj News reported that on 15 December 2025 the Motorway Police closed M-2 from Thokar Niaz Baig to Hiran Minar, M-3 from Dakhana to Faizpur, M-4 from Pindi Bhattian to Abdul Hakeem, M-5 from Zahir Pir to Sher Shah and M-11 from the Lahore toll plaza to Sambrial. We found no notice barring goods vehicles as a class. The effect is delay: trucks wait for visibility, usually after sunrise, and a week of fog can stack several one-day delays.

A loaded truck on the road

Sizing the stock

Take a boiler burning 10 tonnes a day. Delivery takes five days from order and you allow four for December fog. That is nine days, 90 tonnes, and with 25 tonne trucks four trucks, 100 tonnes, on the ground before the next order goes in. The five days is an assumption for the example; ask us what it is for your site.

Cash tied up in that stock, at the delivered Duki lump price
Daily burn (tonnes)Stock (tonnes)Delivered price per tonne, RsCash tied up, Rs
55051,7502,587,500
1010051,7505,175,000
2020051,75010,350,000
4037551,75019,406,250
Prices are indicative and change with the weekly sheet.
Stock to hold for 9 days of cover, rounded up to whole 25 tonne trucks
  • 5 tonnes a day50 tonnes
  • 10 tonnes a day100 tonnes
  • 20 tonnes a day200 tonnes
  • 40 tonnes a day375 tonnes

Daily burn x 9 days, divided by 25 and rounded up to whole trucks. Replace 9 with your own lead time plus fog buffer.

When to book and where to put it

Fill the yard to target in the first half of November, top up whenever stock falls to the reorder level, and keep a few days of cover through December and January when gas and roads are least reliable. People who book in November are not the ones calling in January. The article on winter coal prices explains what is pushing the sheet.

Lay a hard drained base, keep piles low and spread with a path for a loader, away from walls and gas lines, covered before rain, oldest coal first. If there is no room for 100 tonnes, hold less and order more often; a small pile that turns over in a fortnight is safer than a large one that sits two months. If a truck is stuck in fog, do not pay for a rush unless stock is under two days. Sindh coal arrives from the south on a different road, but it carries much less heat, so read the Sindh coal article before counting on it as a substitute.

Prices are indicative, per tonne, excluding sales tax, and change week to week. See today's sheet or ask us for a confirmed price.

GradesIn this guide

Grades mentioned

Lumps of black coal, close-up

Balochistan's most traded coal, lump or run-of-mine

Duki coal

Origin
Duki, Loralai, Balochistan
Heat value
5,500–6,500 kcal
Size
Lump or mixed
For
Brick kilns, small industry

FromRs 34,000per tonne, ex-yard

Dark, shiny pieces of coal, close-up

Higher-grade lump for kilns and cement blending

Chamalang coal

Origin
Chamalang, Loralai–Kohlu, Balochistan
Heat value
5,800–6,800 kcal
Size
Lump
For
Brick kilns, cement (blended)

FromRs 40,000per tonne, ex-yard

A matte block of coal on a white background

The cheapest heat, for firing and blending

Coal fines (choora)

Origin
Duki, Mach and Harnai fields
Heat value
4,500–5,500 kcal
Size
0–10 mm
For
Brick kiln firing, blending

FromRs 25,000per tonne, ex-yard

QuotationToday's price

Get a confirmed price.

Tell us what you need. We send you a written price within 2 working hours.

You sendCoal, tonnes, city
We replyWritten price in 2 h
We deliverKarachi and Punjab in 2–3 days
A loaded haul truck on a mine road
Coal
Tonnes

Written price within 2 working hours.

Private. Your number is only used to send your price.

Prefer WhatsApp? 0349 4384514

Delivery and guidesAll cities

Keep reading, or get coal delivered.