Articles / 6 min read
Balochistan coal supply after the minerals forum: what changes this winter
Balochistan coal supply to Punjab mills, Karachi and the rest of the country does not change because of the Pakistan Minerals Investment Forum held in Islamabad on 12 and 13 November 2026. The speeches were about copper, gold and processing minerals at home, and the security pledge was for mines and investors in general; nothing reported from the forum named coal, coal royalties or coal leases. What does decide your winter supply is the same as last year: safety and security at the mines, the roads out of the province, and how much stock you hold when one of them stops.

What the minerals forum said, and what it left out
Prime Minister Shehbaz Sharif told investors to mine, process and manufacture in Pakistan and then export. Radio Pakistan reported him naming refineries, smelters and cable and conductor factories as the industries the government wants, and calling the protection of investors' manpower, assets and supply routes the government's responsibility.
The Nation reported on 14 November that Field Marshal Asim Munir told the forum that mines, miners, investments, industries and projects would be protected, and that mineral development must benefit local communities. The announcements were about metals: a copper estimate for Dasht-e-Kain in Chagai from the Frontier Works Organization, gold and copper finds reported by Mari Minerals, a $100 million investment by National Resources Limited, and 13 agreements and MoUs. The paper said Reko Diq is expected to start production in 2028 and that the next forum is planned for November 2027.
The security pledge is not new. Dawn reported the army chief promising a security framework for investors in Balochistan at the first forum in April 2025.
For a coal buyer the useful reading is what is missing. No coal field, coal royalty, coal lease or coal road was in the reporting we found. Processing at home is aimed at copper and gold. Balochistan coal is already burnt at home, in Punjab kilns and boilers and in cement plants, so the processing push does not touch it.
Security and safety at the coal mines this year
The latest incident we found reported was not an attack. On 7 November 2026 toxic gas filled a coal mine in Duki, killing one miner and leaving two unconscious, according to 24NewsHD. Gas has been the bigger killer in the coalfields this year, and our article on coal mine safety in Balochistan covers the July blast at Sorange and the checks a buyer can ask for.
The security side came up in the Senate in March. Arab News reported on 17 March 2026 that a senator told a standing committee that coal miners pay money per tonne to the Frontier Corps for security and that the banned BLA also takes money. The chief minister's aide denied that security charges are levied on small miners, said no formal extortion complaints had been received, and said an anti-extortion cell is working.
Either way, the forum's pledge does not put new guards on a Duki or Harnai road this winter that we could find reported. Treat supply risk as you did last season.

Leases and royalty: no new coal rules on the record
The last provincial announcement we found on mining leases came in December 2025. Dawn reported Chief Minister Sarfraz Bugti telling the Mines Owners' Association that a strategy to curb illegal mining and make the lease system more transparent was being prepared, that mining had been given industry status, and that rescue centres were planned for Chamalang and Duki.
Mining land in the province is typically leased for 30 years, according to the same Arab News report on the Senate hearing.
We found no 2026 notice changing the royalty on coal, and nothing at the forum about it. A royalty change would show up in the mine gate price and then on our price sheet, so the sheet is where you will see it first.
Thar Block II at 11.2 million tonnes: context, not a new source
The other big coal story of the autumn is in Sindh. ProPakistani reported on 6 October 2026 that the Phase III expansion of Thar Block II raised the mine's capacity from 7.6 to 11.2 million tonnes a year. The extra 3.6 million tonnes goes to Lucky Electric's 660 MW power plant.
Thar coal is mined for power. APP reported that Thar power plants burnt 13.83 million tonnes of local coal in 2025-26. Express Tribune, citing the Annual Plan 2026-27, put the whole country's coal output that year at 21.147 million tonnes.
So the bigger Thar mine does not add coal to the market that mills and kilns buy from. Our article on whether factories can buy Thar output goes through who sells it and on what terms. For a Faisalabad or Lahore boiler this winter, the coal still comes up the road from Balochistan.
How to keep Balochistan coal supply steady this winter
Snow is the winter risk that needs no news to predict. On 22 January 2026 heavy snow cut Quetta off: Dawn reported traffic suspended on highways linking Balochistan with other provinces, including the road to D.I. Khan and Islamabad via Zhob. The News reported the next day that the N-25, N-40, N-50 and N-65 had been cleared, with the Met Office expecting the weather system to last until 28 January.
Strikes and security stoppages have run longer than a snow closure. Our timeline of Balochistan coal transport strikes sets out each stoppage since 2024 and how many days of stock each one argues for, so the figure is not repeated here. What stock costs is easy to work out from this week's sheet: one extra truck of Duki run-of-mine held on site is Rs 47,000 x 25 = Rs 1,175,000 delivered before tax, of which Rs 13,000 x 25 = Rs 325,000 is road freight to Lahore.
A second grade from a different field is the cheaper insurance, because a stoppage at Duki does not always stop Sor Range or Mach. The table puts every grade on the same footing: rupees for each million kcal delivered.
| Grade | Field | Rs a tonne delivered | Rs a truck of 25 t | Rs per million kcal |
|---|---|---|---|---|
| Duki lump | Duki | 51,750 | 1,293,750 | 8,625 |
| Duki run-of-mine | Duki | 47,000 | 1,175,000 | 8,545 |
| Chamalang lump | Chamalang | 53,000 | 1,325,000 | 8,413 |
| Sor Range | Sor Range / Degari | 52,250 | 1,306,250 | 8,038 |
| Mach / Harnai | Mach and Harnai | 45,500 | 1,137,500 | 7,845 |
| Coal fines | Varies | 38,000 | 950,000 | 7,600 |
Before you order
Most of this is ordinary buying, done earlier in the season than usual.
- Order the trucks you need for late December and January before the snow forecasts start, not after a road is shut.
- Run a trial of your second grade now, while supply is normal, so a switch in January is not a gamble.
- Ask which field the truck loads from. Before a truck loads, the man at the mine sends us a video of the coal and the truck number, and lumps with a band of stone through them are left out. Ask for that video.
- Watch the snow forecasts and highway reports for the roads out of Quetta; they tell you more about January supply than investment news.
Questions people ask
Will the minerals forum bring coal prices down?
Nothing announced at the forum touched coal prices. This week's moves on our sheet came from Punjab's anti-smog drive sealing kilns, which this week's price note explains.
Is Reko Diq or the Chagai copper anything to do with coal?
No. They are copper and gold projects in Chagai district. Neither produces coal or changes the supply from Duki, Chamalang, Sor Range, Mach or Harnai.
Prices are indicative, per tonne, excluding sales tax, and change week to week. See today's sheet or ask us for a confirmed price.




